Just a reminder to everyone that the parking and driveway restrictions for the south side of West 12th Road that were originally put in place back in October are still in effect.
The ongoing coffer dam pit excavation requires over sized container trucks to back down W12thRd numerous times each day and it is important to maintain the south side of the street clear to allow unimpeded access for these construction vehicles.
No comments:
Post a Comment